Hi,
I think you might be confusing between the costing side and the billing rate. Normally on the costing side for the same Work Center (or Cost Center) it is the same price (means cost) not influenced by who is the customer.
On the billing side you can have different customer specific rates (prices) according to the contract, and those can be calculated in SD.
Regards,